Book Online or Call 1-855-SAUSALITO

Sign In  |  Register  |  About Sausalito  |  Contact Us

Sausalito, CA
September 01, 2020 1:41pm
7-Day Forecast | Traffic
  • Search Hotels in Sausalito

  • CHECK-IN:
  • CHECK-OUT:
  • ROOMS:

The Shishi Hongshan Power Plant Wharf Approach Dike and Breakwater Repair Project has officially started construction

By: Prodigy
12/12/2024, Xiamen, Fujian // PRODIGY: Feature Story //

Recently, the construction of the Fujian Shishi Hongshan Thermal Power Plant Coal Terminal Project breakwater and approach embankment protection damage repair project, in which the Xiamen Branch of CCCC Third Harbor Engineering Co.,Ltd. participated, officially started.

The coal terminal project of Hongshan Thermal Power Plant in Shishi, Fujian is located in the sea area south of the mouth of Quanzhou Bay, about 2 kilometers east of Dongdian Village, Jinshang Town, Shishi City. The project construction period is about 8 months. The main work content is to repair the damage to the breakwater and approach dike. The repair area is 350 meters of breakwater, 770 meters of approach dike, and 80 meters of approach bridge. It includes the prefabrication, replacement, hoisting and adjustment of cushion blocks and twisting blocks. The weights of the twisting blocks are 7 tons, 10 tons, 13 tons and 18 tons respectively.

The timely start of this repair project will promote the comprehensive safe production of Fujian Hongshan Cogeneration Power Coal Terminal under complex and harsh sea conditions, provide stable and efficient power supply to the region, and strengthen regional energy security, which is of positive significance.

In 2008, Xiamen Branch of CCCC Third Harbor Engineering Co.,Ltd. won the bid for the Fujian Hongshan Cogeneration Power Coal Terminal and approach embankment project. After the project was completed, it won the National Quality Engineering Award and the China Electric Power Quality Engineering Award. This project is the company's second win in Fujian Hongshan Cogeneration's breakwater repair project after 16 years. "Xiamen Branch of CCCC Third Harbor Engineering Co.,Ltd." will continue to develop its ambitions in "Fujian Hongshan Cogeneration Power Co.,Ltd". (Author: Yuan Hongming, Lai Junhai)

Company:Xiamen Branch of CCCC Third Harbor Engineering Co., Ltd.

Contact Person:lugang

Email: sh6dwzzb@163.com

Website:http://www.ccshj6.com

Telephone:0592-5686315

City:Xiamen, Fujian

Disclaimer:

The opinions expressed in this article are those of the author and do not necessarily reflect the views or positions of KISS PR or its partners. This content is provided for informational purposes only and should not be construed as legal, financial, or professional advice. KISS PR makes no representations as to the accuracy, completeness, correctness, suitability, or validity of any information in this article and will not be liable for any errors, omissions, or delays in this information or any losses, injuries, or damages arising from its display or use. All information is provided on an as-is basis.




Source: Prodigy.press

Release ID: 1228316
Stock Quote API & Stock News API supplied by www.cloudquote.io
Quotes delayed at least 20 minutes.
By accessing this page, you agree to the following
Privacy Policy and Terms and Conditions.
 
 
Photos copyright by Jay Graham Photographer
Copyright © 2010-2020 Sausalito.com & California Media Partners, LLC. All rights reserved.