Book Online or Call 1-855-SAUSALITO

Sign In  |  Register  |  About Sausalito  |  Contact Us

Sausalito, CA
September 01, 2020 1:41pm
7-Day Forecast | Traffic
  • Search Hotels in Sausalito

  • CHECK-IN:
  • CHECK-OUT:
  • ROOMS:

Granite’s Grant Road Widening Project Aims to Improve Traffic Flow and Safety in Tucson

Granite (NYSE:GVA) has been awarded a contract worth approximately $55 million by the City of Tucson to widen Grant Road from Palo Verde to Venice. Project funding will come from the Regional Transportation Authority and is expected to be included in Granite’s first quarter CAP.

This press release features multimedia. View the full release here: https://www.businesswire.com/news/home/20240131329881/en/

‌ “This multi-phase project will require continuous communication and outreach with the traveling public, local businesses and residents throughout the project,” said Todd Hill, Granite Vice President of Regional Operations. “In addition to serving as an anchor project to the Arizona region and local workforce, the project also compliments our vertically integrated business with a need for aggregates and asphalt on the project.” (Photo: Business Wire)

‌ “This multi-phase project will require continuous communication and outreach with the traveling public, local businesses and residents throughout the project,” said Todd Hill, Granite Vice President of Regional Operations. “In addition to serving as an anchor project to the Arizona region and local workforce, the project also compliments our vertically integrated business with a need for aggregates and asphalt on the project.” (Photo: Business Wire)

The project involves widening Grant Road to provide six through lanes and a median with left turn lane pockets. It also includes new curbs, sidewalks, landscaping, traffic signals, streetlights, detention pond, water main replacement, sewer main additions, cross roadway box culverts & storm drains, and a large 96" diameter culvert for storm runoff mitigation.

Granite will utilize its nearby Swan Plant facility to provide 36,000 tons of hot-mix asphalt (HMA), 40,000 tons of aggregate base course, and 32,500 tons of storm/water/sewer bedding and shading sand.

“This multi-phase project will require continuous communication and outreach with the traveling public, local businesses and residents throughout the project,” said Todd Hill, Granite Vice President of Regional Operations. “In addition to serving as an anchor project to the Arizona region and local workforce, the project also compliments our vertically integrated business with a need for aggregates and asphalt on the project.”

The project is anticipated to begin in April 2024 and is expected to be completed by December 2026.

About Granite

Granite is America’s Infrastructure Company™. Incorporated since 1922, Granite (NYSE:GVA) is one of the largest diversified construction and construction materials companies in the United States as well as a full-suite civil construction provider. Granite’s Code of Conduct and strong Core Values guide the Company and its employees to uphold the highest ethical standards. Granite is an industry leader in safety and an award-winning firm in quality and sustainability. For more information, visit the Granite website, graniteconstruction.com, and connect with Granite on LinkedIn, X, Facebook, and Instagram.

Contacts

Granite Contacts

Media

Erin Kuhlman 831-768-4111

Investors

Wenjun Xu - 831-761-7861

Data & News supplied by www.cloudquote.io
Stock quotes supplied by Barchart
Quotes delayed at least 20 minutes.
By accessing this page, you agree to the following
Privacy Policy and Terms and Conditions.
 
 
Photos copyright by Jay Graham Photographer
Copyright © 2010-2020 Sausalito.com & California Media Partners, LLC. All rights reserved.